Patch Lining
The process of a drainage patch repair involves the use of a compressor, an inflatable rubber packer, thin woven textile matting and a 2-compound resin. The 2 resin compounds are mixed together then spread onto both sides of the matting. The matting is then folded and wrapped round the packer (which is covered with a film to prevent the patch sticking to the packer.) The patch is then pushed or pulled into position and the packer is inflated. The patch is then kept in the line under pressure until the resin has cured. The packer is then deflated and removed from the pipe. Finally, a CCTV camera is used to confirm that the patch repair has been installed successfully.
Have a project in mind?
From routine surveys to complex civils and confined-space works, our teams deliver across Scotland. Let's talk about yours.